Microwave assemblies must perform reliably after being routed through an airframe and throughout many missions. W. L. Gore & Associates’ installation simulator has allowed us to engineer products to meet and exceed industry standards and end-user requirements. Proven durable and reliable over time, our microwave assemblies reduce replacement costs and ensure mission-critical success and peace of mind.
Brochures, 1.64 MB
A simple switch to high-performance, long-life GORE® GFO® Packing Fiber can help plant and mill pumps to operate more efficiently, and enable significant savings in power, water and maintenance costs.