GORE® Valve Stem Installation Instructions

Valve Stem Installation Instructions

English

Instructions on how repack a valve stem using GORE Valve Stem Packing.


  1. Isolate valve pressure to remove existing valve stem packing.
  2. Remove old material from stuffing box.
  3. Repack stuffing box with the largest size GORE-TEX® valve stem packing which will fit into stuffing box by hand.
Size Replaces
2.5mm / 3/32" 3/32", 1/8"
4mm / 5/32" 5/32", 3/16", 7/32"
6mm / 1/4" 1/4", 9/32"
8mm / 5/16" 5/16"
10mm / 3/8" 3/8"
13mm / 1/2" 1/2"
16mm / 5/8" 5/8"
19mm / 3/4" 3/4"

FOR INDUSTRIAL USE ONLY

Not for use in food, drug, cosmetic or medical device manufacturing, processing, or packaging operations.